Closed: A 200-metre section of the Rideau Canal Eastern Pathway, between Clegg and Herridge streets, is closed to pedestrians and cyclists at all times to allow the construction of the Rideau Canal Crossing (Fifth Avenue to Clegg Street).

When: Wednesday, November 29, 2017 until fall 2018.

Detour: Directional signage is installed on-site to advise pathway users of the closure and the detour to take during the work on Echo Drive. The National Capital Commission recommends that users use the detour in place or use the Rideau Canal Western Pathway along the Queen Elizabeth Driveway during the work.

NCC Closures

You can view this closure as well as all other NCC closures.